Product classification
CONTACT US
WECHAT/WHATSAPP :
Skype :
TEL :
0086-371-86525099
0086-15136236223
E-MAIL :
Concrete Mixer With Pump
● Products :DHBT15 Diesel Concrete Mixer Pump
● Type :Concrete Mixer With Pump
● Brand :HAMAC
● Origin :China
If you want to know more details, please contact us, we will reply you as soon as possible.
>
Product Introduction>
Benefits & Features>
More InfoDiesel Engine Driven Concrete Mixer with Pump | ||||
Parts Name/Parameters | Parts Brand Name | Quantity | Specification | |
Power | Diesel Engine | WEICHAI | 1 pc | 72 KW |
Rated Rotation | 1800r/m | |||
Mixing System | Mixer | Domestic | 1 set | Drum Mixer,JZM450 |
Power | By Hydraulic from Engine | |||
Submersible Pump | 1 pc | hydraulic water pump | ||
Max. Theoretical Mixing Output | / | / | 25m³/h | |
Pumping System | Main Oil Pump | Kawasaki | 1pc | K3V112 |
Double Gear Pump | Domestic | 1set | 25&16 | |
Valves | Japanese | 4sets | overflow and directional valves | |
Main Oil Cylinder | Domestic | 2pcs | Φ100×Φ70×800mm | |
Delivery Cylinder | Domestic | 2pcs | Φ200×800mm | |
S Valve | Domestic | 1pc | Φ200mm | |
Cutting Ring | alloy | 1pc | Φ200mm | |
Glass Wear Plate | alloy | 1pc | Φ200mm | |
Max. Theoretical Pumping Output | / | / | 40m³/h | |
Hydraulic System Type | / | / | Open | |
Hopper Capacity × Filling Height | / | / | 600/1050(L/mm) | |
Max. Aggregate Size | / | / |
Pebble:40 Crushed Stone:30 mm |
|
Outlet Pressure | / | / | 8Mpa | |
Oil Tank Capacity | / | / | 200L | |
Rated Speed | / | / | 1480Rpm | |
Slumps | / | / | 12-23cm | |
Tyre Size | / | / | 700R16 | |
Towing Speed | / | / | Max. 8km/h | |
Overall | Total Weight | / | / | 5300kg |
Machine Size(L*W*H) | / | / | 4960*2100*2600 mm | |
Delivery height/horizontal distance | / | / | 70/300m | |
Packing | / | / | 1* 40HQ |
Technical support and after-sales service team in the Philippines
1. 24 hours online service freely;
2. One year warranty time except for vulnerable parts.
3. Life long maintenance service;
4. Send engineers to install and debug the equipment;
5. Freely train operators to use and maintain skills;
6. Send engineers to fix failure if customers need;
7. Supply all kinds of spare parts;