Product classification
CONTACT US
WECHAT/WHATSAPP :
Skype :
TEL :
0086-371-86525099
0086-15136236223
E-MAIL :
Concrete Placing Boom
● Products :Floor climbing Hydraulic Concrete Placing Boom
● Type :Concrete Placing Boom
● Brand :HAMAC
● Origin :China
If you want to know more details, please contact us, we will reply you as soon as possible.
>
Product IntroductionHot Sale in stock: DHBT40 Diesel concrete pump - HBT60 Electric concrete pump - HBT15 Concrete mixing pump - 42m Concrete Boom Pump Truck - 17m Concrete Placing Boom - HBT80 Electric concrete pump - Get quote or inquiry!
>
Benefits & Features>
More InfoModel | HGY24 | HGY28 | HGY32 | |||
Delivery pipe dimension (outside diameter×thickness) (mm) |
φ133×4.5 | φ133×4.5 | φ133×4.5 | |||
Delivery hose dimension (inside diameter×length) (mm) |
φ125×3000 | φ125×3000 | φ125×3000 | |||
Radius of placing boom(m) | 24 | 27.7 | 31.7 | |||
Stationary height(to the join between the end of the boom and swivel table(m) | 22.7 | 22.7 | 22.7 | |||
Three hydraulic foldable arms |
1st section | 10.5m | 10.5m | 14.5 | ||
2nd section | 9.2m | 9.2m | 9.2m | |||
3rd section | 8.0m | 8.0m | 8.0m | |||
Boom articulation | 1st section | -4.2°~+82.5° | -4.2°~+82.5° | 0-82.5° | ||
2nd section | O°~180° | O°~180° | O°~180° | |||
3rd section | O°~180° | O°~180° | O°~180° | |||
Slewing range(°) | 360 | 360 | ||||
Power of motor(kw) | 11 | 11 | 15 | |||
Pressure of hydraulic system (MPa) | 26 | 30 | 30 | |||
Type of hydraulic oil | AW68 | AW68 | L-HM 68 | |||
Climbing | 3.0 | |||||
The min.Interval of climbing | Placing concrete | 6.0 | ||||
Frame (m) | Resting | |||||
Mode of operation |
1. cable remote control 2. radio remote control |
|||||
power | 380V/50Hz | |||||
wind speed | Placing concrete | ≤60 km/h | ||||
Climbing | ≤28 km/h | |||||
working temperature | O~60℃ |
Technical support and after-sales service team in the Philippines
1. 24 hours online service freely;
2. One year warranty time except for vulnerable parts.
3. Life long maintenance service;
4. Send engineers to install and debug the equipment;
5. Freely train operators to use and maintain skills;
6. Send engineers to fix failure if customers need;
7. Supply all kinds of spare parts;